BIGM — Production Tube Well & Pump System

Production tube-well development and submersible-pump installation for the Bangladesh Institute of Governance and Management project.

Project metadata

Client / organisation
Tekken Corporation — BIGM project
Location
Dhaka, Bangladesh
Timeline
2026

Overview

Triangle Engineers Ltd. signed a contract with Tekken Corporation on 26 January 2026 for production tube-well development and submersible-pump installation at the Bangladesh Institute of Governance and Management (BIGM) project. Engr. Shahjahan Alam represented the group at the signing. This record describes the awarded scope, as reported in his LinkedIn update of 29 January 2026.

Professional role

Triangle Engineers Ltd. — EPC Contractor

Engineering scope

An EPC water-supply package covering the production well, pumping equipment, pipework, electrical connections and water-quality checks.

Responsibilities

Prepare working drawings and mobilise the site.
Undertake boring, piping, submersible-pump installation and electrical connections.
Carry out washing and cleaning, water sampling and testing.
Prepare documentation and complete the planned handover.

Contribution

The contract defined an integrated delivery approach for the well and pump system. The post highlights fine-sand aquifers, possible borehole collapse and water-quality risks as technical considerations; completion is not claimed here.

Triangle Engineers and Tekken representatives at BIGM contract signing