Design review and installation supervision for multistage turbine pumps at Rooppur Nuclear Power Plant, Ishwardi, Pabna.

Project metadata

Client / organisation
Paharpur Cooling Towers Limited — RNPP Lots 2900 & 800
Location
Ishwardi, Pabna, Bangladesh
Timeline
From September 2024

Overview

Engr. Md. Shahjahan Alam provided mechanical consultancy for turbine-pump installation at Rooppur Nuclear Power Plant in association with Paharpur Cooling Towers Limited. The assignment covered multistage turbine pumps rated at 800 m³/h and 10 bar each.

Professional role

Mechanical Consultant

Engineering scope

Mechanical installation consultancy for RNPP Lots 2900 and 800, covering the interface between pump equipment, foundation bases and installation tolerances.

Responsibilities

Review installation drawings, designs and technical documents.
Coordinate stakeholder meetings and finalise the scope and work procedures.
Supervise foundation-base construction and pump installation.
Check base-flange levels, shaft alignment, deflection and deviations.
Support corrective actions and submit the final report.

Contribution

His contribution combined technical-document review with on-site measurements and installation supervision, including level confirmation, alignment checks, deviation assessment and reporting.

Engineering team at Rooppur Nuclear Power Plant cooling towers